Climbing System 240cm


It supports the efficiency and cost effectiveness of climbing systems in adjusting flexibly to the structure geometry and in permitting larger formwork units.
l Can be adjusted up to +/- 15 degrees on the geometry of the structurel High load-bearing capacity
l Saving of time and costs by transposing of larger formwork units
l Long service life and functionality by hot-dip galvanizing as surface protection
l High degree of safety at work by working space in front of and behind the formwork
l Little transport volume by modular construction
| Technical Data | |
|---|---|
| Bracket depth | 2,40 m |
| Live loads | Working platform: 4,5 / 3,0 kN/m² |
| Concrete platform: 1,5 kN/m² | |
| Suspended scaffold: 1,0 kN/m² | |
| Inclination | + / - 15° |
Request Documentation Request a Quote

